Overhead Crane Condition Assessment

Crane Condition Assessment for overhead-crane assets. A structured assessment of mechanical, electrical, structural, safety and maintenance-history data to support maintenance,.

Overhead Crane Condition Assessment
Service Scope

A technical approach focused on root cause, not symptoms

A bridge-crane condition assessment reviews bridge structure, end carriages, wheels, runway, hoisting machinery, electrics, controls and safety functions in one decision framework. Findings are prioritized for immediate, short-term, planned or engineering action. It supports maintenance and modernization planning and does not replace statutory inspection.

01Equipment and fault history
02Site inspection and measurement
03Root cause and scope
04Execution and functional test
Service-Specific Request

Crane Condition Assessment Request

Share nameplate, age, capacity, duty, maintenance history, known faults and site images.

Technical dimensions
Your request is structured for technical review and can be sent directly through the WhatsApp summary.
Frequently Asked Questions

Questions clarified before technical review

Core answers on capacity, duty, installation, maintenance, spare parts and project planning.

What information is required for a crane quotation?+

Rated load, span, lifting height, operating area, daily cycles, load type, power supply, site location and photographs are the key starting data.

Should I choose a single-girder or double-girder overhead crane?+

The decision depends on span, capacity, headroom, hook approach, duty class and maintenance access. Tonnage alone is not sufficient.

Can an existing crane be modernized?+

Yes, when the supporting structure and main mechanical components remain suitable. Controls, drives, brakes, limits and safety functions can be renewed after technical assessment.

Do you provide service throughout Türkiye?+

Engineering, manufacturing, installation, maintenance, modernization and spare parts support are planned for industrial sites throughout Türkiye.

Do you undertake international projects?+

Yes. Technical specifications, logistics, installation conditions, local requirements and commissioning scope are reviewed before acceptance.

Which photographs should be sent for a breakdown request?+

Send the complete equipment view, faulty area, motor and gearbox nameplates, control panel, error display and a short video of the symptom when safe.

How often should a crane be maintained?+

Intervals depend on duty class, cycles, environment, load spectrum and manufacturer instructions. Legal periodic inspection and preventive maintenance are separate processes.

Direct Contact with Engineering

Let us review the load, site and objective together

Send a structured request for a new crane, modernization, maintenance, fault or spare parts.